Nigeria's downstream petroleum distribution network recorded fresh vessel arrivals and berth activities between June 1 and June 5, 2026, as multiple PMS, AGO, and Butane across Lagos and Calabar discharge corridors, supporting depot replenishment and sustaining fuel distribution activities nationwide.
Latest tanker movements monitored by Petroleumprice.ng across key Jetties indicate continued coastal redistribution of petroleum products from major supply hubs into private depots and terminals. PMS remained the dominant product moving through the marine logistics chain, while AGO, and Butane cargoes also supported industrial, aviation and retail fuel supply operations.
Confirmed Tanker Positions: Lagos
AQUILA – PMS
- Quantity: 38,000 MT
- Arrival Date: 01 June 2026
- Berth Date: 01 June 2026
- Jetty: APAPA Single point mooring (ASPM)
- Receiver: AYM SHAFA
- Status: Discharging 15k parcel, then to shift to BOP Apapa for bal 23k.
PINARELLO – AGO
- Quantity: 27,000 MT
- Arrival Date: 27 May 2026
- Berth Date: 02 June 2026
- Jetty: Bulk Oil Petroleum Jetty (BOP)
- Receiver: NIPCO
- Status: Loaded at Dangote Refinery, Discharging 18k parcel, then to sail to Warri for bal.
ALFRED TEMILE 10 – BUTANE
- Quantity: 12,600 MT
- Arrival Date: 02 June 2026
- Berth Date: 02 June 2026
- Jetty: Petroleum wharf Apapa
- Receiver: ARDOVA
- Status: Loaded at Bonny River Terminal, Discharging in progress.
BORA – AGO
- Quantity: 20,000 MT
- Arrival Date: 30 May 2026
- Berth Date: 02 June 2026
- Jetty: IBAFON, BERTH-2
- Receiver: RAIN OIL / NEPAL
- Status: Loaded at Dangote Refinery, Discharging in progress.
KINGIS – AGO
- Quantity: 18,000 MT (ROB)
- Arrival Date: 22 May 2026
- Berth Date: 04 June 2026
- Depot: AA RANO
- Receiver: AA RANO
- Status: Loaded at Dangote Refinery, Awaiting Terminal readiness to start discharge PM/04.
ZONDA – PMS
- Quantity: 25,000 MT
- Arrival Date: 02 June 2026
- Berth Date: 04 June 2026
- Depot: BOVAS
- Receiver: BOVAS OIL
- Status: Loaded at Dangote Refinery, Awaiting clearances to commence discharge PM/04.
STELLAR – PMS
- Quantity: 31,000 MT
- Arrival Date: 27 May 2026
- Berth Date: 05 June 2026
- Depot: AIPEC
- Receiver: PIVOT ENERGY
- Status: Loaded at Dangote Refinery, Awaiting berthing for discharge at AIPEC.
AQUILA – PMS
- Quantity: 23,000 MT (ROB)
- Arrival Date: 01 June 2026
- Berth Date: 05 June 2026
- Jetty: Bulk Oil Petroleum
- Receiver: AYM SHAFA
- Status: Next tanker to berth/discharge balance cargo.
Confirmed Tanker Positions:
Calabar
SAVANNA – PMS
- Quantity: 20,000 MT
- Arrival Date: 03 June 2026
- Berth Date: 05 June 2026
- Depot: Mainland
- Receiver: MAINLAND OIL
- Status: Loaded at Sabaek, Next tanker to berth/discharge.
Market Outlook
Fresh PMS arrivals dominated vessel activity during the period under review, with AYM Shafa, Bovas Oil, Pivot Energy, Mainland Oil and other marketers receiving or preparing to receive significant product volumes through Lagos and Calabar marine channels.
AGO movements remained active, particularly through NIPCO, Rain Oil, Nepal and AA Rano supply corridors, while Ardova continued butane discharge operations to support LPG-related demand.
The continued movement of coastal cargoes from Dangote-linked supply chains into private depots and terminals is expected to support product availability across major consumption centres. With several vessels still discharging and additional cargoes awaiting berth allocation, downstream stock levels are likely to remain relatively stable in the near term.
